The plan was to bring the Sweeps to site and then to wait for a "window in the weather" to hang them.
Work began on Thursday 24th November.
The first Stock was fitted that day, however problems arose with the fitting of the second Stock.
It would appear that the Stock design did not take account of the taper within the Canister and, as a result, the second Stock was not fitted until the following Monday.
|